Project: Arch. Fabrizio Bianchetti
Recovery and expansion
The construction of the new Rowing Centre intended to implement the recovery and expansion of the building of the former at the solar colony Lido di Gozzano (Lake Orta). The construction works in two directions: on the one hand the recovery of the existing building which is characterized by the arched roof, and secondly, through the addition of two new buildings in a dialectical confrontation.